TITLE: Becker Schools – Exterior Building and Site Signage
LOCATION OF WORK: Becker Public Schools 12000 Hancock Street Becker, MN 55308
OWNER: ISD #726 Becker Public Schools 12000 Hancock Street Becker, MN 55308
PROGRAM MANAGER:
ICS Consulting, Inc.
5354 Edgewood Drive
Mounds View, MN 55112
763-354-2670
PROJECT DESCRIPTION:
Bid package scope includes the supply and installation of various building, site and way-finding signs.
BID DATE AND LOCATION:
Sealed bids will be received at the Becker Public Schools District Office located at 12000 Hancock Street, Becker, MN 55308, then publicly opened and read aloud. Bids will be received and stamped-in prior to 2:00 PM local time, on July 29, 2014.
EXAMINATION OF DOCUMENTS:
Bidders may obtain drawings and specifications for the project from ICS Consulting, Inc. Contact Amy Mallet at 763-354-2670.
BIDDING REQUIREMENTS:
Each bidder must comply with the following requirements to reassure acknowledgment recognition of their bids:
Bids must be accompanied by bid security in form of certified check, cashier's check, or bid bond in amount of 5% of base bid submitted, made payable to owner, as guarantee that bidder will, if awarded, enter into contract in accordance with contract documents and submitted bid.
Submit bid in duplicate on the prescribed form, which is furnished with the specification, with full name and address of the bidder.
Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures.
Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a bidder is a co-partnership, then signatures on the bid shall be by an authorized member of the firm, with names and addresses of each member of partnership.
Base bid and all alternate bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner's option, it shall be cause for rejection of bid. Complete form without alteration.
Submit alternate prices (bid) for either increasing or decreasing the cost as called for on bid form and Description of Alternates. Submit a bid for all alternates.
Owner may make such investigations as he deems necessary to determine the ability and responsibility of the bidder to perform the work, and any bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of bidder will be considered in making an award, including, but not limited to: (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the bidder.
Owner reserves the right to (1) accept bidder's Base Bid only, (2) accept any one or more of bidder's Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on his investigation of bidders, as well as acceptance of alternates, all of which Owner deems to be in their best interest, (5) waive informalities or minor irregularities in bids and waive minor irregularities or discrepancies in bidding procedure.
Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions.
BIDDING DOCUMENTS & SITE REVIEW:
Each bidder (including subcontract bidder where appropriate) is responsible to visit the site and to fully inform himself and record his own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, type of soil, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect his bid or the Work.
Prior to submitting a bid, each bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings and specifications for the Project (including those primarily for other Subcontracts), become thoroughly familiar with the scope of the Project and all factors and items of work which will affect his bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract.
No extras will be allowed the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of his failure to study and record his own findings. Submission of a bid shall be proof that such examinations have been made and that bidder has recorded his own investigation and has become thoroughly familiar with ail contract documents (including all addenda). The failure or omissions of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his bid.
START DATE:
Work may begin after receipt of the signed contract. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The work on the premise is anticipated to begin August 18, 2014.
SUBSTANTIAL AND COMPLETION DATE:
Owner requires work to be substantially complete on or before September 19, 2014 and fully complete before September 26, 2014. Specific areas of the facility will require earlier final completion as outlined in the specifications. Bids shall reflect all costs necessary to meet these schedule requirements.
END OF SECTION 00 00 30
(Published in the Sherburne County Citizen: 07/26/14.)