DOCUMENT 00 11 13
Advertisement for Bids
2022 County Road 53 Street and Utility Improvements
Becker, Minnesota
SEH No. BECKR 161349
Notice is hereby given that Online Bids will be received by the City Administrator until 11:00 a.m., Thursday, April 7, 2022, via QuestCDN for the furnishing of all labor and material for the construction of 2022 County Road 53 Street and Utility Improvements.
The bid opening will be conducted via Microsoft Teams, at which time they will be publicly opened and read aloud:
2022 CR 53 Street and Utility Improvements Bid Opening
Thursday, April 7, 2022 at 11:00 a.m.
Please join my meeting from your computer, tablet or smartphone: https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjEwY2ZkM2ItNTFkNS00NTkxLWI0NmItYTcxMzFmMWY1MjMz%40thread.v2/0?context=%7b%22Tid%22%3a%22642f4553-88f1-43dc-9a29-90842cd19d4c%22%2c%22Oid%22%3a%2248472820-a408-4d5c-b262-d033b1c6fa20%22%7d
Or call in (audio only)
+1 872-242-7640,,818759384# United States, Chicago
Phone Conference ID: 818 759 384#
Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply.
Major quantities for the Work include:
10,500 | LIN FT | 12-Inch PVC C900 Forcemain |
1,300 | LIN FT | Jack & Bore 30-Inch Casing |
1 | LUMP SUM | Sanitary Sewer Pump Station |
20,000 | CU YD | Common Excavation |
10,375 | CU YD | Aggregate Base Class 5 (CV) |
6,800 | TON | Bituminous Pavement Mixtures |
22 | EA | Water Hydrant |
35 | EA | 6 – 18 inch Gate or Butterfly Valve |
17,900 | LIN FT | 8 – 18-Inch HDPE DR 11 Water Main |
21 | EA | Sanitary Manhole |
290 | LIN FT | Extra Depth Manhole |
7,200 | LIN FT | 8 – 21-Inch PVC Sanitary Sewer |
370 | LIN FT | 12 – 18-Inch RCP Pipe Culvert |
4.5 | ACRE | Tree Clearing and Grubbing |
29.50 | ACRE | Turf Establishment |
35 | EA | Lighting Unit Type Special |
16,000 | LIN FT | Pavement Markings 4-Inch Striping |
The Bidding Documents may be seen at the Issuing Office of SEH located at 2351 Connecticut Avenue, Suite 300, Sartell, MN 56377, 320.229.4300.
The Bidding Documents may be viewed for no cost at http://www.sehinc.com by selecting the Project Bid Information link at the bottom of the page and the View Plans option from the menu at the top of the selected project page.
Digital image copies of the Bidding Documents are available at http://www.sehinc.com for a fee of $30. These documents may be downloaded by selecting this project from the “Project Bid Information” link and by entering eBidDocTM Number 8113478 on the SEARCH PROJECTS page. For assistance and free membership registration, contact QuestCDN at 952.233.1632 or info@questcdn.com.
For this project, bids will ONLY be received electronically. Contractors submitting an electronic bid will be charged an additional $30 at the time of bid submission via the online electronic bid service QuestCDN.com. To access the electronic Bid Worksheet, download the project document and click the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list through QuestCDN for bids to be accepted. Bids shall be completed according to the Bidding Requirements prepared by SEH dated March 1, 2022.
In addition to digital plans, paper copies of the Bidding Documents may be obtained from Docunet Corp. located at 2435 Xenium Lane North, Plymouth, MN 55441 (763.475.9600) for a fee of $100.
Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders.
A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3.
This Work shall be subject to minimum wages and labor standards in accordance with the State of Minnesota.
The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner.
Jeff O’Neill
Interim City Administrator
Becker, Minnesota
(Published in the Patriot: 03/12/22; 03/26/22).