Monday, September 16th, 2024 Church Directory

Public Notices 3 21 15

Cellco Partnership and its controlled affiliates doing business as Verizon Wireless (Verizon Wireless) proposes to build a 259-Foot Self-Support Communications Tower. Anticipated lighting application is medium intensity dual red/white strobes. The Site location is 59th Street Southeast, Becker, Sherburne County, MN 55308. Latitude: 45° 28’ 54.24” Longitude: 93° 50’ 31.22”. The Federal Communications Commission (FCC) Antenna Structure Registration (ASR, Form 854) filing number is A0938644.
ENVIRONMENTAL EFFECTS – Interested persons may review the application (www.fcc.gov/asr/applications) by entering the filing number. Environmental concerns may be raised by filing a Request for Environmental Review (www.fcc.gov/asr/environmentalrequest) and online filings are strongly encouraged. The mailing address to file a paper copy is: FCC Requests for Environmental Review, Attn: Ramon Williams, 445 12th Street SW, Washington, DC 20554.
HISTORIC PROPERTIES EFFECTS – Public comments regarding potential effects from this site on historic properties may be submitted within 30-days from the date of this publication to: Terracon Consultants, ATTN: NEPA Department, 3535 Hoffman Road East, White Bear Lake, MN 55110; (651) 770-1500; or jlshepard@terracon.com.
(Published in the Sherburne County Citizen: 03/21/15.)