Thursday, April 18th, 2024 Church Directory

City of Becker

City of Becker WWTF Request for Proposal

The City of Becker owns and operates a municipal wastewater treatment facility (WWTF).  The WWTF has two separate treatment trains:  Domestic and Industrial.  The industrial treatment train is dedicated to treating wastewater flows from a paper mill located in the city.  During the treatment process, solids settle out in the industrial oxidation ditches which results in large deposits that take up treatment capacity and decrease the efficiency of the treatment process on the Industrial side.  To correct this issue, the City is looking to hire a contractor to clean this debris out of these tanks. 

To obtain a copy of the RFP which outlines the scope of this project, please contact Chris Lisson at clisson@ci.becker.mn.us or 612-619-565.

Proposal Due Date:  4 PM on August 15, 2022

Submit proposal to:  Chris Lisson-City of Becker Public Works and Parks Assistant Director

Proposals can be submitted by email (clisson@ci.becker.mn.us), mail (Attn: Chris Lisson, PO box 250, Becker, MN.  55308) or delivered to the WWTF located at 14398 Central Avenue in Becker. 

Preliminary Schedule

  1. Proposals due to the city by 4 PM on August 15, 2022
  2. Selection of service provider by August 19, 2022
  3. Project completion on or before December 1, 2022

 (Published in the Patriot: 07/30/22; 08/06/22.)