SECTION 00 11 13 - ADVERTISEMENT FOR BID 

TITLE:                                               Becker Public Schools

                                                            Primary/EEC

                                                            Additions & Remodeling

LOCATION OF WORK:                Becker Primary School

                                                      12050 Hancock St.

                                                      Becker, MN 55308

OWNER:                                          Becker Public Schools

                                                      12000 2nd Street SE

                                                      Becker, MN 55308

                                                      763-261-4914

CONSTRUCTION                          ICS

MANAGER:                                  1139 Franklin Ave Suite 1

                                                      Sauk Rapids, MN 56379

                                                      612-412-1492

                                                      Contact: Josh Utsch

                                                      josh.utsch@ics-builds.com

ARCHITECT:                                  MLA Architects

                                                      12 Long Lake Road Suite 17

                                                      St. Paul, MN 55115

                                                      651-770-4442

STRUCTURAL:                              ERA Structural Engineering

                                                      2550 University Ave West Suite 423-S

                                                      Saint Paul, MN 55114

                                                      651-251-7570

MECHANICAL &                            CMTA

ELECTRICAL ENGINEER:          1331 Tyler Street NE Suite 201

                                                       Minneapolis, MN 55413

                                                       612-249-5600

CIVIL ENGINEER:                       Bolton and Menk, Inc.

                                                            7575 Golden Valley Road, Suite 200

                                                       Minneapolis, MN 55427

                                                       507-794-5541

PROJECT DESCRIPTION:

The project consists of multiple work scopes for all of the work necessary for the construction of additions and remodeling including but not limited to site improvements, concrete, interior finishes, mechanical, electrical, and all associated utilities and amenities.

BID DATE AND LOCATION:

Sealed Bids will be received at Becker Public Schools District Office: 12000 2nd St SE, Becker, MN 55308 then publicly opened and read aloud. Bids will be received and stamped-in prior to 2 p.m. local time on August 11th, 2022. Bids submitted after allotted time will be discarded, NO EXCEPTIONS

EXAMINATION OF DOCUMENTS:

Bidders may view drawings and specifications for the project at the office of the Construction Manager.

For Electronic access to the bidding documents, please contact Kris Shattuck at 612-808-9855.  ICS can also provide locations of Builders Exchanges holding plans for contractors to access.  Bidders are responsible for any and all costs associated with the production of plans and specifications for their use.

BIDDING REQUIREMENTS:

Each Bidder must comply with the following requirements to reassure acknowledgment and recognition of their Bids:

Bids must be accompanied by Bid security in the form of a certified check, cashier's check, or Bid bond in the amount of 5% of the base Bid submitted, made payable to the owner, as guarantee that Bidder will, if awarded, enter into contract in accordance with contract documents and submitted Bid.

Bids are to include sales and use taxes.

Submit Bid on the prescribed form, which is furnished with the specification, with full name and address of the Bidder.

Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures.

Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a Bidder is a co-partnership, then signatures on the Bid shall be by an authorized member of the firm, with names and addresses of each member of partnership.

Base Bid and all alternate Bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner's option, it shall be cause for rejection of Bid. Complete form without alterations.

Submit alternate prices (Bids) for either increasing or decreasing the costs, as called for on Bid form and Description of Alternates.  Submit a Bid for all alternates.

Owner may make such investigations as they deem necessary to determine the ability, competency, and responsibility of the Bidder to perform the work. Any Bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of Bidder will be considered in making an award, including, but not limited to; (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) the ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the Bidder.

Owner reserves the right to: (1) accept Bidder’s Base Bid only, (2) accept any one or more of bidder's Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on their investigation of Bidders, as well as acceptance of alternates, all of which the Owner deems to be in their best interest, (5) waive informalities or minor irregularities in Bids and waive minor irregularities or discrepancies in Bidding procedure.

Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions.

 BIDDING DOCUMENTS & SITE REVIEW:

Each Bidder (including subcontract Bidder where appropriate) is ADVISED to visit the site and to fully inform themself and record their own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, type of soil, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect their Bid or the Work.

Prior to submitting a Bid, each Bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings, and specifications for the Project (including those primarily for other Subcontracts). Contractors shall become thoroughly familiar with the scope of the Project and all factors and items of work which will affect their Bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract.

No extras will be allowed to the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of their failure to study and record their own findings. Submission of a Bid shall be proof that such examinations have been made and that Bidder has recorded their own investigation and has become thoroughly familiar with all contract documents (including all addenda). The failure or omissions of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to their Bid. Nor shall it be the responsibility of ICS or its counterparts to ensure you have read all documentation. This is the sole responsibility of the Bidder and it’s Sub-Contractor(s).

PRE-BID CONFERENCE:

A Pre-Bid conference will be held at 9 am on July 21st, 2022 at 12050 Hancock Street, Becker, MN 55308 If Bidders want to visit the physical site, a site review will take place immediately following the Pre-Bid conference.  No extras will be allowed because of the Bidder’s misinterpretation as to the amount of work involved, Bidder’s own error, negligence, or failure to examine the site. 

START DATE:

Work will begin after receipt of the signed contract from the Owner. The anticipated award date is August 31st, 2022.  Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises March 2nd, 2023.

SUBSTANTIAL AND COMPLETION DATE:

Owner requires all work to be substantially complete by December 27th, 2023.

END OF SECTION 00 11 13